Concrete Core Drilling
27 Years of Precision and Safety

Core Drilling as a task is very simple and straight forward, it is basically a drill on steroids, that can drill with different barrels, through reinforced concrete slab, any diameter you require up to 600mm.
We drill with precision and quality of work, and we have the equipment and expertise to do just about any task the most common uses are:
- Drill between post tension cables
- Work precisely to avoid rebar and electrical cables
- Work cleanly by controlling the concrete slush while coring
- Stitch coring openings for HVACs and lift pit drainage
- Coring can be used to create better and more secure rigging options
With many of the big cutting and removal jobs we do, Core drilling, from over cut cores to rigging, it is an essential part of our removal process.
With our in house manufacturing, we continuously fight the good fight against high cost and rise in the import prices of barrels and diamond tipped segments.
Doing all of this while keeping costs low, with great service and long standing expertise, we can handle all your coring needs.
Stitch coring
A method of using many core holes interlinked together to form any shape of geometry for a desired purpose.
Many Hvac opening are created this way due to the size and speed a coring machine can get the job done, in limited space.
Stitch coring has many uses, with its versatility it allows a person to manipulate concrete openings to your desired size and shape.
Deep hole Core Drilling
Deep hole drilling is just simple coring done to much greater depth.
While it seems fairly simple, it also creates a great deal of opportunity on how to get a desired outcome
For example.
We’ve even gone as far as drilling a 3m deep, 250mm diameter hole in a single core, to remove sleeves for underpinning in a foundation.
We have drilled a 63mm hole that links up perfecting inline to help laying concrete pipes, the holes act as a locator, as well as a means to control the way a pipe is lowered into position.
We have drilled for many purposes and many depths up to 6m
At DCCS we strive to go where nobody has gone before, we are always up for the challenge, we are looking for the next deep hole challenge.














