Concrete Scanning

With Precision and Accuracy

IMG_7301

With the advancement of modern technology, we have embraced change and the endless possibilities.

We have done everything from scans for post tension to rebar analysis for an entire building.

We work hand in hand with the best engineers in the business, to identify and collect all the data for possibilities to renovate buildings, demolish concrete silos and buildings or simply locate steel drainage pipes in columns.

The most common uses for scanning range from:

  • rebar layout
  • rebar sizes
  • coverage
  • rebar and stirrups in a beam
  • post tension cables
  • locating ideal coring or drilling locations
  • locating live elctrical cables

We have done a lot of work with the top engineers on structural analysis, gathering information from the concrete, from how the slabs interlink with beams and columns to a basic overview on the whereabouts of the post tension cables, and how they move in the slab.

When it comes to scanning we have done just about everything there is, the machine truly hasn’t found its maxium potential.